Project Description
The project involved laying of 150 km of 225 KV transmission line between Republic of Mali and Republic of Cote d’lvoire.
Client
Ministry of Energy and Water
End Date
12th Oct 2014
Type of Contract
Turnkey Transmission Line Project
Challenges
- Pneumatic hammers used for rock blasting 1 meter underneath the soil
- Special Towers were designed and installed to cater to long spans
- Superior Piling technology was used