Project Description

The project involved Design, Supply, Installation and Commissioning of 60 KW solar-DG Hybrid Power Plant at Kaur, Gambia. The scope of work includes: –

  • Installation of Polycrystalline Solar PV modules
  • Size of Battery bank : 15000 Ah at 48 V DC (720 kwh)
  • Client

    National Water & Electricity Company Limited, Gambia

    End Date

    30th June 2014

    Type of Contract

    Turnkey Solar Electrification Project


    Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/meadmin/public_html/wp-content/plugins/wordfence1/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/meadmin/public_html/wp-content/plugins/wordfence1/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/meadmin/p...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/meadmin/public_html/wp-content/plugins/wordfence1/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35