Mohan Energy Corporation Pvt. Ltd. (MEC) is a leading international contracting company engaged in executing turnkey projects in the power sector.

MEC offers specialised services in the areas of Rural Electrification, Overhead Transmission Lines, Substation projects, Solar Electrification Projects, Wind Power Projects, Mini and Micro Hydel Projects and Biomass Projects

Substation Projects

 

Mini & Micro Hydel Projects
Overhead Transmission Lines
Wind Power Projects
Rural/Urban Distribution Projects
Biomass & Biogas Projects
Solar Electrification Projects
Power Generation & Auxiliaries
 
 

Gambia Rural Electrification Extension Project Ph 2

National Water & Electricity Company(NAWEC) has awarded a Rural Electrification Extension Project PHASE-II to Mohan Energy Corporation.The scope of work includes

  • Design , Engineering , Supply , Installation & Commissioning of 30 KV Transmission line works in Barra Eassau region along with interconnection of existing Power Station with Bansang, Kerewan and Barra Essau.
  • Power Plant : Design , Engineering , Supply & Installation & Commissioning of 2X2.5 MW HFO based DG Power Plants in Farafenni&Basse region

The Project is to be completed within 15 months from the date of commencement. The project is being financed by EBID ,Lome under a Line of credit from Exim Bank of India.

Project Status: LOI Awarded.

Supply and installation of capacitor bank in the sources of substation, National Grid- MALI

MEC recently signed this contract. Scope of work includes

  • Engineering, Procurement and construction of Panel Type Capacitor Bank along with associated Switchgear and other accessories, i.e. cable in 12 locations.
  • The project is scheduled to be completed within 08 Months from the date of commencement.
  • Client – EDM- SA Mali.

Project Status: Under Execution.

Electrification of 18 Rural Localities in the Department of Atlantique, Collines and Mono in Benin.

MEC is awarded with this project where in scope of work is limited to:

  • Supply of Electrical Equipments and construction of MV & LV Lines for Electrification of 18 Localities in Atlantique, Colline and Mono region.
  • This project is being funded by EBID.
  • The project is to be completed within 15 monthsfrom the date of commencement.

Project Status: Under Execution.

220KV Transmission Lines Project, Agra – Bharatpur (UP) and Sarna- Hiranagar (Jammu).

PGCIL had awarded a 220 KV transmission line Project to MEC.

The Scope of work includes complete supply of towers, conductors, insulators, hardware’s, accessories and commissioning of line. The project is to be completed within 15 months from date of commencement.

Project Status
a): Sarna- Hiranagar 220KV line has been successfully completed by MEC.
b) Agra – Bharatpur 220KV Transmission Line is under execution.

CONSTRUCTION OF 220 kV& 132KV TRANSMISSION LINE PROJECT.

MEC is executing 220KV & 132KV Transmission Line Projects for UPPTCL. The scope of work includes complete supply of towers, insulators, hardware’s, construction and commissioning of 258 KM of 220KV D/C & S/C (D/C- Double Circuit, S/C- Single Circuit) and 132KV D/C & S/C transmission Lines. The project is to be within 18 months from the date of commencement.

Project Status: : Currently the project is under advance stage of completion.

250KW ROOF TOP SOLAR POWER PLANT AT METROPOLITAN MALL- GURGAON.

MEC has entered in an contract with MGF Mall Management, Gurgaon, Haryana to set up solar power plant on the roof top. The scope includes, supply, installation and commissioning 250KW of roof top solar power plant and supply of power to MGF under PPA. The project was to be completed in Six Months from date of commencement.

Project Status : The project has been successfully completed by MEC and is supplying power to MGF since April 2016.

100KW ROOF TOP SOLAR POWER PLANT AT MEGACITY MALL- GURGAON.

MEC has entered in an contract with MGF Mall Management, Gurgaon, Haryana to set up solar power plant on the roof top. The scope includes, supply, installation and commissioning 100KW of roof top solar power plant and supply of power to MGF under PPA.

Project Status : Under Execution.

17.36 KW ROOF TOP SOLAR POWER PLANT

NTPC has awarded a Solar Power Plant Project to MEC, the scope of which includes design, supply and installation of 4.96LW, 6.2KW,6.2KW Grid Connected solar systems on NTPC Directors flats.

Project Status : Under Execution.

SUPPLY AND CONSTRUCTION OF 132 KV SOLU CORRIDOR SUB STATION.

Nepal Electricity Authority (NEA)has awarded 132KV Sub Station project to Mohan Energy Corporation.

The scope of work includes Engineering, Procurement and Construction of 2 Nos. 132KV Line Bays, One No. Transformer Bays and Installation of One No. 30MVA, 132/33KV Transformer. The Project is to be completed within 30 months from the date of commencement. Project Status: Under Execution.

Project Status : Under Execution.

SUPPLY AND CONSTRUCTION OF 132 KV SOLU CORRIDOR TRANSMISSION LINE .

Nepal Electricity Authority has awarded 132KV Transmission Line project to Mohan Energy Corporation.

The scope of work includes Design, testing, complete supply of towers, conductors, insulators, hardware’s, construction and commissioning of the line. The Project is to be completed within 30 months from the date of commencement.

Project Status : Under Execution.

STRENTHENING OF 132KV INDIA-NEPAL POWER.

Indian Ministry of External Affairs (MEA) has awarded a 132KV Transmission Line project to Mohan Energy Corporation. The Scope of work includes design, engineering, supply, erection and commissioning of 132KV S/C Line. The project is to be completed within 18 months from date of commencement.

Project Status : Under Execution.

Gambia Rural Electrification Project

MEC executing a contract with NAWEC in The Gambia for a Turnkey Project for Rural Electrification. The project is financed by EBID, Lome under Exim Bank of India financing. The project is to be completed within 18 months. The preliminary design & engineering has been completed. Civil works are likely to commence from January 2014.

225KV Substation at Sikasso, Segou & Koutiala, Mali

MEC executing a contract for supplementary works for 225 kV substations at Sikasso, Segou and Koutiala. The Project is financed by BOAD. Major equipment's have been shipped. Erection work is in progress and the project is scheduled to be completed in May 2014.MEC will be installing for the first time SVC system in the Mali power system. This system will provide reliable and quality power to the local electricity authority EDM.

30/15 kV Substation, Kati, Mali

MEC recently signed a contract with Energie Du Mali- SA, Mali for design, supply, installation and commissioning of 30/15 kV Substation in Kati, Mali. The project is being financed by World Bank. Civil works for the substation already commenced in December 2013.

30/15 kV Substation at Djikoroni (DCO) Mali.

MEC was awarded a contract for design, engineering, supply, installation and commissioning of 30/15 kV substation at Djikoroni- Bamako, the project was financed by the World Bank. The substation was successfully commissioned in October 2013.

Solar Electrification Project in Gaza and Sofala Province in Mozambique.

MEC is installing solar systems in 100 nos. primary health centres in Gaza & Sofala. The electrification work at gaza province has been successfully completed and handed over to FUNAE in January 2013 but work in Sofala has been hampered due to heavy rains and civil war in that area.

Solar Project in Lusaka, Zambia.

MEC was recently awarded a contract by ZESCO ltd., the state owned utility of Zambia. The project includes 2 Nos. 25 KWp roof top solar power systems to be installed at Parliament Building and ZESCO head office . ZESCO team visited India in October 2013 to inspect the material. All the material have been shipped and the project is likely to be completed by March 2014.

Compagnie Energie Electrique Du Togo (CEET), Togo

MEC executing a contract to electrify 38 villages in TOGO. The project will be completed and handed over to the client by end of December 2013.The project will provide benefit of electricity to more than 9000 Households.